Fares
Regular Ride
$1.75/Ride
Senior 62+ / Medicare / Customer with Disability
$.75 peak
$.35 off-peak
K-12 and Community College Students
Free with GoPass
Low Income (LIFE)
20 Free rides/mo
Projects
Phase
Type
Location
Translate
Loading Events

« All Events

  • This event has passed.

Wilshire/La Cienega Instrumentation Repair

September 30, 2021 @ 8:00 pm - October 1, 2021 @ 7:00 am

Summary

Multiple lane reductions are anticipated to be implemented within the Wilshire Blvd. and La Cienega Blvd. intersection, beginning Thursday, September 30 at 8pm, and continuing through Friday, October 1 at 7am. This traffic control will support instrumentation repair within the intersection.

Where

  • Wilshire Blvd. and La Cienega Blvd.

When

  • Thursday, September 30 at 8pm, continuing through Friday, October 1 at 7am.

Traffic Control

  • Eastbound Wilshire Blvd. will be reduced to a single lane between Le Doux Rd. and Hamilton Dr.
  • Northbound La Cienega Blvd. will be reduced to a single lane between about 200 feet south of Wilshire Blvd. and Wilshire Blvd.
  • Left turns from southbound La Cienega Blvd. to eastbound Wilshire Blvd. will be restricted.
  • Left turns from westbound Wilshire Blvd. to southbound La Cienega Blvd. will be restricted.

Access

  • Access for Emergency Vehicles & First Responders will be maintained.

Details

Start:
September 30, 2021 @ 8:00 pm
End:
October 1, 2021 @ 7:00 am
Scroll to Top