Fares
Regular Ride
$1.75/Ride
Senior 62+ / Medicare / Customer with Disability
$.75 peak
$.35 off-peak
K-12 and Community College Students
Free with GoPass
Low Income (LIFE)
20 Free rides/mo
Projects
Phase
Type
Location
Translate
Loading Events

« All Events

  • This event has passed.

Eastside Transit Corridor Phase 2: Public Hearing #3

August 11, 2022 @ 6:00 pm - 8:00 pm

Metro has a plan to make it easier to get around, including the Eastside Transit Corridor Phase 2 project, which proposes an extension of the L Line (Gold) further east from its current terminus at Pomona Bl and Atlantic Bl in East Los Angeles. 

A Draft Environmental Impact Report (EIR) has been released for public review and comment. Comments on the Draft EIR will be accepted through August 29, 2022, at each public hearing or via any of the following methods: online at metro.net/eastsidecomments or by calling 213.922.3012. 

Public hearings will take place (both in person and virtually). For the latest information, please visit metro.net/eastside2022. 

VIRTUAL 

Thursday, August 11, 2022, 6–8pm 

Zoom Link: tinyurl.com/3k8pms7f 

Call-In Number: 213.338.8477 

Meeting ID: 814 9183 9547 

Details

Date:
August 11, 2022
Time:
6:00 pm - 8:00 pm
Event Category:

Venue

Virtual Meeting
CA United States
Scroll to Top