Fares
Regular Ride
$1.75/Ride
Senior 62+ / Medicare / Customer with Disability
$.75 peak
$.35 off-peak
K-12 and Community College Students
Free with GoPass
Low Income (LIFE)
20 Free rides/mo
Projects
Phase
Type
Location
Translate
Ongoing
Ongoing
Ongoing
Ongoing

Instrumentation Work on Wilshire/Bonsall Ramp

Summary Metro contractors will conduct instrumentation work on the eastbound Wilshire Blvd. on- ramp at the VA Hospital Campus.  Date: Date: August 30 Work hours: 9am to 3pm Traffic Controls:  Eastbound […]

Ongoing

Instrumentation Work on Wilshire/Bonsall Ramp

Summary Metro contractors will conduct instrumentation work on the eastbound Wilshire Blvd. on- ramp at the VA Hospital Campus.  Date: Date: August 30 Work hours: 9am to 3pm Traffic Controls:  Eastbound […]

Ongoing

Instrumentation Work on Wilshire/Bonsall Ramp

Summary Metro contractors will conduct instrumentation work on the eastbound Wilshire Blvd. on- ramp at the VA Hospital Campus.  Date: Date: August 30 Work hours: 9am to 3pm Traffic Controls:  Eastbound […]

Ongoing

Instrumentation Work on Wilshire/Bonsall Ramp

Summary Metro contractors will conduct instrumentation work on the eastbound Wilshire Blvd. on- ramp at the VA Hospital Campus.  Date: Date: August 30 Work hours: 9am to 3pm Traffic Controls:  Eastbound […]

Ongoing

Instrumentation Work on Wilshire/Bonsall Ramp

Summary Metro contractors will conduct instrumentation work on the eastbound Wilshire Blvd. on- ramp at the VA Hospital Campus.  Date: Date: August 30 Work hours: 9am to 3pm Traffic Controls:  Eastbound […]

Ongoing

Experience the El Monte Emerald Necklace presented by BEST

Join ActiveSGV for a morning roll along one of the most historic stretches of the Rio Hondo River as part of the Emerald Necklace, presented by Metro’s Bicycle Education Safety Training (BEST) Program. The […]

Vermont Transit Corridor’s Community Listening Session

Ward African Methodist Episcopal Church 1177 W 25th Street, Los Angeles

The Community Listening Sessions feature interactive activities designed to present information and receive feedback on your vision for the Vermont Transit Corridor that extends between Hollywood Bl (on the north) and 120th St (on the south).

I-10 ExpressLanes Extension Public Scoping Meeting #3

Virtual Meeting CA

Metro has a plan for a better drive on the 10. This plan includes improved mobility with efforts like the I-10 ExpressLanes Extension Project. Please join us to learn more about this proposed project to extend existing ExpressLanes on the Interstate 10 Freeway further east.

Scroll to Top