Piling in UCLA Lot 36

Summary  Metro contractors began pile installation in UCLA Lot 36 on Monday, August 23. The piles support the walls underground for the future Westwood/UCLA Station. Piling will continue in stages on Wilshire Blvd between Westwood Blvd and […]

Traffic Signal Light Pole and Foundation Removal on the north side of Wilshire Blvd. between Westwood Blvd. and Veteran Ave.

Summary  Metro contractors will remove traffic signals and foundations in Westwood from September 27 to October 8. Removal of the traffic signal light poles and foundations will be on the north side of Wilshire Blvd between Westwood […]

Tree Survey

Metro wants to hear from you as we finalize the design of the project elements, including landscaping. The following survey demonstrates possible street tree options along the Van Nuys Blvd segment of the Project. There will be various opportunities for constituents to give feedback on the project as it moves forward. This tree survey is an opportunity to help shape the corridor.

Traffic Camera Maintenance on Wilshire Blvd. between Westwood Blvd. and Veteran Ave.

Summary  Metro contractors will conduct maintenance work on the traffic cameras on Wilshire Blvd. between Westwood Blvd. and Veteran Ave. Temporary traffic measures will be used in stages for each intersection. Work will be completed at the northeast corner of Veteran Ave. and Wilshire Blvd., the southeast […]

Scroll to Top