Tree Survey

Metro wants to hear from you as we finalize the design of the project elements, including landscaping. The following survey demonstrates possible street tree options along the Van Nuys Blvd segment of the Project. There will be various opportunities for constituents to give feedback on the project as it moves forward. This tree survey is an opportunity to help shape the corridor.

Traffic Signal Light Pole and Foundation Removal on the north side of Wilshire Blvd. between Westwood Blvd. and Veteran Ave.

Summary  Metro contractors will remove traffic signals and foundations in Westwood from September 27 to October 8. Removal of the traffic signal light poles and foundations will be on the north side of Wilshire Blvd between Westwood […]

Construction Committee

Virtual Meeting CA, United States

boardagendas.metro.net

Accessibility Advisory Committee (AAC)

Virtual Meeting CA, United States

Agenda TO JOIN THE VIRTUAL MEETING, LOG ON TO THE FOLLOWING ADDRESS THROUGH YOUR PREFFERED BROWSER: https://us02web.zoom.us/j/85241968587 FOR TELEPHONE ACCESS DIAL (669) 900 9128 When prompted enter Meeting ID: 852 […]

Scroll to Top