Traffic Signal Light Pole and Foundation Removal on the north side of Wilshire Blvd. between Westwood Blvd. and Veteran Ave.

Summary  Metro contractors will remove traffic signals and foundations in Westwood from September 27 to October 8. Removal of the traffic signal light poles and foundations will be on the north side of Wilshire Blvd between Westwood […]

LIFE Program Sign-ups at Long Beach Outreach Event

Long Beach Transit & Visitor Information Center 130 E. First St, Long Beach

Join us to sign up and tap into savings. We’ve made it easier to participate in Metro’s LIFE Program, which offers deep discounts for low-income riders. Sign up now and […]

Streets & Freeways Subcommittee

Virtual Meeting CA, United States

Agenda The Streets and Freeways Subcommittee is a technical subcommittee of Metro’s Technical Advisory Committee (TAC). The Streets and Freeways Subcommittee meets on the third Thursday of every month at […]

Piling on Wilshire Blvd between Westwood Blvd and Gayley Ave

Piling on Wilshire Blvd between Westwood Blvd and Gayley Ave

Pile Installation and support of excavation work will continue the north side of Wilshire Blvd between Westwood Blvd and Gayley Ave. The “piles” support the underground walls for the future Westwood/UCLA Station. The street will be restriped, and concrete “k-rail” barriers will be placed on […]

LIFE Program Sign-up Event at Pomona Station

Pomona Station 100 W Commercial St, Los Angeles

Join us to sign up and tap into savings. We’ve made it easier to participate in Metro’s LIFE Program, which offers deep discounts for low-income riders. Sign up now and […]

Scroll to Top