Fares
Regular Ride
$1.75/Ride
Senior 62+ / Medicare / Customer with Disability
$.75 peak
$.35 off-peak
K-12 and Community College Students
Free with GoPass
Low Income (LIFE)
20 Free rides/mo
Projects
Phase
Type
Location
Translate

Piling on Wilshire Blvd between Westwood Blvd and Gayley Ave

Pile Installation and support of excavation work will continue the north side of Wilshire Blvd between Westwood Blvd and Gayley Ave. The “piles” support the underground walls for the future Westwood/UCLA Station. The street will be restriped, and concrete “k-rail” barriers will be placed on […]

South Sycamore Ave. Closure at Wilshire Blvd.

Summary  Beginning Saturday, September 25, 2021, and continuing through Monday, April 4, 2022, Wilshire Blvd. between Detroit St. and Highland Ave. will be reduced to two lanes in each direction. Sycamore Ave. immediately south of Wilshire Blvd. will be closed. This traffic control will […]

LIFE Program Sign-ups at Long Beach Outreach Event

Long Beach Transit & Visitor Information Center 130 E. First St, Long Beach

Join us to sign up and tap into savings. We’ve made it easier to participate in Metro’s LIFE Program, which offers deep discounts for low-income riders. Sign up now and […]

Instrumentation Work on Wilshire/Bonsall Ramp

Summary Metro contractors will conduct instrumentation work on the eastbound Wilshire Blvd. on- ramp at the VA Hospital Campus.  Date: Date: August 30 Work hours: 9am to 3pm Traffic Controls:  Eastbound […]

Streets & Freeways Subcommittee

Virtual Meeting CA, United States

Agenda The Streets and Freeways Subcommittee is a technical subcommittee of Metro’s Technical Advisory Committee (TAC). The Streets and Freeways Subcommittee meets on the third Thursday of every month at […]

Piling on Wilshire Blvd between Westwood Blvd and Gayley Ave

Pile Installation and support of excavation work will continue the north side of Wilshire Blvd between Westwood Blvd and Gayley Ave. The “piles” support the underground walls for the future Westwood/UCLA Station. The street will be restriped, and concrete “k-rail” barriers will be placed on […]

Piling on Wilshire Blvd between Westwood Blvd and Gayley Ave

Pile Installation and support of excavation work will continue the north side of Wilshire Blvd between Westwood Blvd and Gayley Ave. The “piles” support the underground walls for the future Westwood/UCLA Station. The street will be restriped, and concrete “k-rail” barriers will be placed on […]

Scroll to Top