Fares
Regular Ride
$1.75/Ride
Senior 62+ / Medicare / Customer with Disability
$.75 peak
$.35 off-peak
K-12 and Community College Students
Free with GoPass
Low Income (LIFE)
20 Free rides/mo
Projects
Phase
Type
Location
Translate

Lunch with Us Webinar: Sections 1, 2, and 3 Construction Update

MTA Building 1 Gateway Plaza, Los Angeles, CA, United States

Lunch with Us Webinar: Sections 1, 2, and 3 Construction Update This lunchtime webinar is for stakeholders interested in Metro Purple Line Extension construction for Sections 1, 2, and 3. When: Wednesday, May 4, from 12pm to 1pm Where: Meeting via Zoom at https://zoom.us/j/96626476708  and live on Facebook. If unable to use a smartphone, please call 669.900.9128, and […]

I-10 ExpressLanes Extension Public Scoping Meeting #1

Virtual Meeting CA, United States

Metro has a plan for a better drive on the 10. This plan includes improved mobility with efforts like the I-10 ExpressLanes Extension Project. Please join us to learn more about this proposed project to extend existing ExpressLanes on the Interstate 10 Freeway further east.

Instrumentation Work on Wilshire/Bonsall Ramp

Summary Metro contractors will conduct instrumentation work on the eastbound Wilshire Blvd. on- ramp at the VA Hospital Campus.  Date: Date: August 30 Work hours: 9am to 3pm Traffic Controls:  Eastbound lane reductions on Wilshire Blvd. between Federal Ave and Bonsall Ave.  Closure of the eastbound Wilshire Blvd. on-ramp for Bonsall Ave.  VA Hospital access will […]

Traffic Signal Light Pole and Foundation Removal on the north side of Wilshire Blvd. between Westwood Blvd. and Veteran Ave.

Summary  Metro contractors will remove traffic signals and foundations in Westwood from September 27 to October 8. Removal of the traffic signal light poles and foundations will be on the north side of Wilshire Blvd between Westwood Blvd and Veteran Ave.       When  Date: September 27 to October 8  Work hours: Monday to Friday, 9am to 3:30pm  Traffic Control:  Westbound Wilshire Blvd traffic control set for Stage […]

LIFE Program Sign-up Event in Lancaster

Owen Memorial Park-Transit Center 43011 10th St W, Lancaster, CA, United States

Join us to sign up and tap into savings. We’ve made it easier to participate in Metro’s LIFE Program, which offers deep discounts for low-income riders. Sign up now and get 90 days of free rides.  Where: Owen Memorial Park-Transit Center, 43011 10th St W, Lancaster, CA 93534 What to bring: Photo ID TAP card, […]

I-10 ExpressLanes Extension Public Scoping Meeting #2

Virtual Meeting CA, United States

Metro has a plan for a better drive on the 10. This plan includes improved mobility with efforts like the I-10 ExpressLanes Extension Project. Please join us to learn more about this proposed project to extend existing ExpressLanes on the Interstate 10 Freeway further east.

First Thursdays at Westwood Village

Rediscover Westwood Village by bike at the First Thursdays block party! The Metro Bike Share team will be inside the main event space directly behind Broxton & Weyburn on Thursday (5/5) from 6:30 – 9:30 pm ready for any assistance you may need.

Instrumentation Work on Wilshire/Bonsall Ramp

Summary Metro contractors will conduct instrumentation work on the eastbound Wilshire Blvd. on- ramp at the VA Hospital Campus.  Date: Date: August 30 Work hours: 9am to 3pm Traffic Controls:  Eastbound lane reductions on Wilshire Blvd. between Federal Ave and Bonsall Ave.  Closure of the eastbound Wilshire Blvd. on-ramp for Bonsall Ave.  VA Hospital access will […]

Traffic Signal Light Pole and Foundation Removal on the north side of Wilshire Blvd. between Westwood Blvd. and Veteran Ave.

Summary  Metro contractors will remove traffic signals and foundations in Westwood from September 27 to October 8. Removal of the traffic signal light poles and foundations will be on the north side of Wilshire Blvd between Westwood Blvd and Veteran Ave.       When  Date: September 27 to October 8  Work hours: Monday to Friday, 9am to 3:30pm  Traffic Control:  Westbound Wilshire Blvd traffic control set for Stage […]

Scroll to Top