Fares
Regular Ride
$1.75/Ride
Senior 62+ / Medicare / Customer with Disability
$.75 peak
$.35 off-peak
K-12 and Community College Students
Free with GoPass
Low Income (LIFE)
20 Free rides/mo
Projects
Phase
Type
Location
Translate

Accessibility Advisory Committee (AAC)

Virtual Meeting CA, United States

Agenda   Overview Metro Accessibility Advisory Committee (AAC) meets on the second Thursday of February, March, May, June, August, September, November, and December in the Union Station Conference Room, 3rd floor in the Metro Headquarters building in downtown Los Angeles. Due to Covid-19 restrictions, meetings will be held virtually until further notice. Accessibility Advisory Committee […]

Eastside Transit Corridor Phase 2 Meeting #2: Cities of Commerce and Montebello

Virtual Meeting CA, United States

The reinitiated environmental process will include the development of a Recirculated Draft Environmental Impact Report (under CEQA) to update the 2014 Draft EIS/EIR. This process includes advanced conceptual engineering, environmental analysis and ongoing outreach efforts. We anticipate releasing a Recirculated Draft EIR for public review in 2022. Join Metro for virtual meetings in March to […]

South Sycamore Ave. Closure at Wilshire Blvd.

Summary  Beginning Saturday, September 25, 2021, and continuing through Monday, April 4, 2022, Wilshire Blvd. between Detroit St. and Highland Ave. will be reduced to two lanes in each direction. Sycamore Ave. immediately south of Wilshire Blvd. will be closed. This traffic control will support emergency exit construction adjacent to the Wilshire/La Brea Station.  When  September 25, 2021 through April 4, 2022.  Work hours are anticipated to be 7am to 8pm, five to six days per week.  Where  Wilshire Blvd. between Detroit […]

Instrumentation Work on Wilshire/Bonsall Ramp

Summary Metro contractors will conduct instrumentation work on the eastbound Wilshire Blvd. on- ramp at the VA Hospital Campus.  Date: Date: August 30 Work hours: 9am to 3pm Traffic Controls:  Eastbound lane reductions on Wilshire Blvd. between Federal Ave and Bonsall Ave.  Closure of the eastbound Wilshire Blvd. on-ramp for Bonsall Ave.  VA Hospital access will […]

Traffic Signal Light Pole and Foundation Removal on the north side of Wilshire Blvd. between Westwood Blvd. and Veteran Ave.

Summary  Metro contractors will remove traffic signals and foundations in Westwood from September 27 to October 8. Removal of the traffic signal light poles and foundations will be on the north side of Wilshire Blvd between Westwood Blvd and Veteran Ave.       When  Date: September 27 to October 8  Work hours: Monday to Friday, 9am to 3:30pm  Traffic Control:  Westbound Wilshire Blvd traffic control set for Stage […]

SCRRA Executive Committee

Virtual Meeting CA, United States

Virtual - http://www.metrolinktrains.com/meeting

South Sycamore Ave. Closure at Wilshire Blvd.

Summary  Beginning Saturday, September 25, 2021, and continuing through Monday, April 4, 2022, Wilshire Blvd. between Detroit St. and Highland Ave. will be reduced to two lanes in each direction. Sycamore Ave. immediately south of Wilshire Blvd. will be closed. This traffic control will support emergency exit construction adjacent to the Wilshire/La Brea Station.  When  September 25, 2021 through April 4, 2022.  Work hours are anticipated to be 7am to 8pm, five to six days per week.  Where  Wilshire Blvd. between Detroit […]

Scroll to Top