Fares
Regular Ride
$1.75/Ride
Senior 62+ / Medicare / Customer with Disability
$.75 peak
$.35 off-peak
K-12 and Community College Students
Free with GoPass
Low Income (LIFE)
20 Free rides/mo
Projects
Phase
Type
Location
Translate

Traffic Signal Light Pole and Foundation Removal on the north side of Wilshire Blvd. between Westwood Blvd. and Veteran Ave.

Summary  Metro contractors will remove traffic signals and foundations in Westwood from September 27 to October 8. Removal of the traffic signal light poles and foundations will be on the north side of Wilshire Blvd between Westwood Blvd and Veteran Ave.       When  Date: September 27 to October 8  Work hours: Monday to Friday, 9am to 3:30pm  Traffic Control:  Westbound Wilshire Blvd traffic control set for Stage […]

Streets & Freeways Subcommittee

Virtual Meeting CA, United States

Agenda Packet. The Streets and Freeways Subcommittee is a technical subcommittee of Metro’s Technical Advisory Committee (TAC). The Streets and Freeways Subcommittee meets on the third Thursday of every month at 9:30 a.m.

I-710 Task Force Meeting #5

MTA Building 1 Gateway Plaza, Los Angeles, CA, United States

Metro and Caltrans invite you to attend the fifth 710 Task Force meeting, which is a space for Task Force members to meet, discuss, plan and debate issues related to the I‐710 South Corridor. Ultimately, the 710 Task Force will develop recommendations for multimodal strategies, projects and programs, and an Investment Plan to improve the communities and transportation system […]

South Sycamore Ave. Closure at Wilshire Blvd.

Summary  Beginning Saturday, September 25, 2021, and continuing through Monday, April 4, 2022, Wilshire Blvd. between Detroit St. and Highland Ave. will be reduced to two lanes in each direction. Sycamore Ave. immediately south of Wilshire Blvd. will be closed. This traffic control will support emergency exit construction adjacent to the Wilshire/La Brea Station.  When  September 25, 2021 through April 4, 2022.  Work hours are anticipated to be 7am to 8pm, five to six days per week.  Where  Wilshire Blvd. between Detroit […]

Instrumentation Work on Wilshire/Bonsall Ramp

Summary Metro contractors will conduct instrumentation work on the eastbound Wilshire Blvd. on- ramp at the VA Hospital Campus.  Date: Date: August 30 Work hours: 9am to 3pm Traffic Controls:  Eastbound lane reductions on Wilshire Blvd. between Federal Ave and Bonsall Ave.  Closure of the eastbound Wilshire Blvd. on-ramp for Bonsall Ave.  VA Hospital access will […]

Traffic Signal Light Pole and Foundation Removal on the north side of Wilshire Blvd. between Westwood Blvd. and Veteran Ave.

Summary  Metro contractors will remove traffic signals and foundations in Westwood from September 27 to October 8. Removal of the traffic signal light poles and foundations will be on the north side of Wilshire Blvd between Westwood Blvd and Veteran Ave.       When  Date: September 27 to October 8  Work hours: Monday to Friday, 9am to 3:30pm  Traffic Control:  Westbound Wilshire Blvd traffic control set for Stage […]

South Sycamore Ave. Closure at Wilshire Blvd.

Summary  Beginning Saturday, September 25, 2021, and continuing through Monday, April 4, 2022, Wilshire Blvd. between Detroit St. and Highland Ave. will be reduced to two lanes in each direction. Sycamore Ave. immediately south of Wilshire Blvd. will be closed. This traffic control will support emergency exit construction adjacent to the Wilshire/La Brea Station.  When  September 25, 2021 through April 4, 2022.  Work hours are anticipated to be 7am to 8pm, five to six days per week.  Where  Wilshire Blvd. between Detroit […]

Instrumentation Work on Wilshire/Bonsall Ramp

Summary Metro contractors will conduct instrumentation work on the eastbound Wilshire Blvd. on- ramp at the VA Hospital Campus.  Date: Date: August 30 Work hours: 9am to 3pm Traffic Controls:  Eastbound lane reductions on Wilshire Blvd. between Federal Ave and Bonsall Ave.  Closure of the eastbound Wilshire Blvd. on-ramp for Bonsall Ave.  VA Hospital access will […]

Traffic Signal Light Pole and Foundation Removal on the north side of Wilshire Blvd. between Westwood Blvd. and Veteran Ave.

Summary  Metro contractors will remove traffic signals and foundations in Westwood from September 27 to October 8. Removal of the traffic signal light poles and foundations will be on the north side of Wilshire Blvd between Westwood Blvd and Veteran Ave.       When  Date: September 27 to October 8  Work hours: Monday to Friday, 9am to 3:30pm  Traffic Control:  Westbound Wilshire Blvd traffic control set for Stage […]

Scroll to Top