Fares
Regular Ride
$1.75/Ride
Senior 62+ / Medicare / Customer with Disability
$.75 peak
$.35 off-peak
K-12 and Community College Students
Free with GoPass
Low Income (LIFE)
20 Free rides/mo
Projects
Phase
Type
Location
Translate

Traffic Signal Light Pole and Foundation Removal on the north side of Wilshire Blvd. between Westwood Blvd. and Veteran Ave.

Summary  Metro contractors will remove traffic signals and foundations in Westwood from September 27 to October 8. Removal of the traffic signal light poles and foundations will be on the north side of Wilshire Blvd between Westwood Blvd and Veteran Ave.       When  Date: September 27 to October 8  Work hours: Monday to Friday, 9am to 3:30pm  Traffic Control:  Westbound Wilshire Blvd traffic control set for Stage […]

On the Move Riders Program Countywide Meeting – Academy Museum of Motion Pictures

Join Metro’s On the Move Riders Program Friday, December 10 at 10:00 a.m. as we take a virtual field trip to the new Academy Museum of Motion Pictures in the heart of Los Angeles! Learn about the Academy Museum and its year-round calendar of rotating exhibitions, film screenings, panel discussions, youth and family programs, and […]

Piling on Wilshire Blvd between Westwood Blvd and Gayley Ave

Pile Installation and support of excavation work will continue the north side of Wilshire Blvd between Westwood Blvd and Gayley Ave. The “piles” support the underground walls for the future Westwood/UCLA Station. The street will be restriped, and concrete “k-rail” barriers will be placed on Wilshire Blvd to protect the public outside of the work zones. Piling work will be completed in stages, and notices will be updated online each week.  When  Date: September […]

South Sycamore Ave. Closure at Wilshire Blvd.

Summary  Beginning Saturday, September 25, 2021, and continuing through Monday, April 4, 2022, Wilshire Blvd. between Detroit St. and Highland Ave. will be reduced to two lanes in each direction. Sycamore Ave. immediately south of Wilshire Blvd. will be closed. This traffic control will support emergency exit construction adjacent to the Wilshire/La Brea Station.  When  September 25, 2021 through April 4, 2022.  Work hours are anticipated to be 7am to 8pm, five to six days per week.  Where  Wilshire Blvd. between Detroit […]

Instrumentation Work on Wilshire/Bonsall Ramp

Summary Metro contractors will conduct instrumentation work on the eastbound Wilshire Blvd. on- ramp at the VA Hospital Campus.  Date: Date: August 30 Work hours: 9am to 3pm Traffic Controls:  Eastbound lane reductions on Wilshire Blvd. between Federal Ave and Bonsall Ave.  Closure of the eastbound Wilshire Blvd. on-ramp for Bonsall Ave.  VA Hospital access will […]

Traffic Signal Light Pole and Foundation Removal on the north side of Wilshire Blvd. between Westwood Blvd. and Veteran Ave.

Summary  Metro contractors will remove traffic signals and foundations in Westwood from September 27 to October 8. Removal of the traffic signal light poles and foundations will be on the north side of Wilshire Blvd between Westwood Blvd and Veteran Ave.       When  Date: September 27 to October 8  Work hours: Monday to Friday, 9am to 3:30pm  Traffic Control:  Westbound Wilshire Blvd traffic control set for Stage […]

I-710 Task Force Meeting #3

1 Gateway Plaza, Los Angeles, CA, United States

As discussed in the first 710 Task Force meeting in September, Metro and Caltrans would like to develop a more collaborative public engagement process to guide our development of an investment strategy for the I-710 South Corridor that reflects the needs of residents in impacted communities. We invite you to join us at our next […]

South Sycamore Ave. Closure at Wilshire Blvd.

Summary  Beginning Saturday, September 25, 2021, and continuing through Monday, April 4, 2022, Wilshire Blvd. between Detroit St. and Highland Ave. will be reduced to two lanes in each direction. Sycamore Ave. immediately south of Wilshire Blvd. will be closed. This traffic control will support emergency exit construction adjacent to the Wilshire/La Brea Station.  When  September 25, 2021 through April 4, 2022.  Work hours are anticipated to be 7am to 8pm, five to six days per week.  Where  Wilshire Blvd. between Detroit […]

Instrumentation Work on Wilshire/Bonsall Ramp

Summary Metro contractors will conduct instrumentation work on the eastbound Wilshire Blvd. on- ramp at the VA Hospital Campus.  Date: Date: August 30 Work hours: 9am to 3pm Traffic Controls:  Eastbound lane reductions on Wilshire Blvd. between Federal Ave and Bonsall Ave.  Closure of the eastbound Wilshire Blvd. on-ramp for Bonsall Ave.  VA Hospital access will […]

Scroll to Top