Pile Installation and support of excavation work will continue the north side of Wilshire Blvd between Westwood Blvd and Gayley Ave. The “piles” support the underground walls for the future Westwood/UCLA Station. The street will be restriped, and concrete “k-rail” barriers will be placed on Wilshire Blvd to protect the public outside of the work zones. Piling work will be completed in stages, and notices will be updated online each week. When Date: September […]
Summary Beginning Saturday, September 25, 2021, and continuing through Monday, April 4, 2022, Wilshire Blvd. between Detroit St. and Highland Ave. will be reduced to two lanes in each direction. Sycamore Ave. immediately south of Wilshire Blvd. will be closed. This traffic control will support emergency exit construction adjacent to the Wilshire/La Brea Station. When September 25, 2021 through April 4, 2022. Work hours are anticipated to be 7am to 8pm, five to six days per week. Where Wilshire Blvd. between Detroit […]
Summary Metro contractors will conduct instrumentation work on the eastbound Wilshire Blvd. on- ramp at the VA Hospital Campus. Date: Date: August 30 Work hours: 9am to 3pm Traffic Controls: Eastbound lane reductions on Wilshire Blvd. between Federal Ave and Bonsall Ave. Closure of the eastbound Wilshire Blvd. on-ramp for Bonsall Ave. VA Hospital access will […]
Summary Metro contractors will remove traffic signals and foundations in Westwood from September 27 to October 8. Removal of the traffic signal light poles and foundations will be on the north side of Wilshire Blvd between Westwood Blvd and Veteran Ave. When Date: September 27 to October 8 Work hours: Monday to Friday, 9am to 3:30pm Traffic Control: Westbound Wilshire Blvd traffic control set for Stage […]
Pile Installation and support of excavation work will continue the north side of Wilshire Blvd between Westwood Blvd and Gayley Ave. The “piles” support the underground walls for the future Westwood/UCLA Station. The street will be restriped, and concrete “k-rail” barriers will be placed on Wilshire Blvd to protect the public outside of the work zones. Piling work will be completed in stages, and notices will be updated online each week. When Date: September […]
Summary Beginning Saturday, September 25, 2021, and continuing through Monday, April 4, 2022, Wilshire Blvd. between Detroit St. and Highland Ave. will be reduced to two lanes in each direction. Sycamore Ave. immediately south of Wilshire Blvd. will be closed. This traffic control will support emergency exit construction adjacent to the Wilshire/La Brea Station. When September 25, 2021 through April 4, 2022. Work hours are anticipated to be 7am to 8pm, five to six days per week. Where Wilshire Blvd. between Detroit […]
Summary Metro contractors will conduct instrumentation work on the eastbound Wilshire Blvd. on- ramp at the VA Hospital Campus. Date: Date: August 30 Work hours: 9am to 3pm Traffic Controls: Eastbound lane reductions on Wilshire Blvd. between Federal Ave and Bonsall Ave. Closure of the eastbound Wilshire Blvd. on-ramp for Bonsall Ave. VA Hospital access will […]
Summary Metro contractors will remove traffic signals and foundations in Westwood from September 27 to October 8. Removal of the traffic signal light poles and foundations will be on the north side of Wilshire Blvd between Westwood Blvd and Veteran Ave. When Date: September 27 to October 8 Work hours: Monday to Friday, 9am to 3:30pm Traffic Control: Westbound Wilshire Blvd traffic control set for Stage […]
Agendas and Minutes Tuesday, January 18, 2022 BOS Presentation #7 Agenda Archives Overview The BOS is one of four subcommittees of the Technical Advisory Committee (TAC). Function "Under the authority of Metro hereinafter called Metro, the Bus Operations Subcommittee, also referred to as BOS, shall be consulted on issues and will provide technical input/assistance to […]
Pile Installation and support of excavation work will continue the north side of Wilshire Blvd between Westwood Blvd and Gayley Ave. The “piles” support the underground walls for the future Westwood/UCLA Station. The street will be restriped, and concrete “k-rail” barriers will be placed on Wilshire Blvd to protect the public outside of the work zones. Piling work will be completed in stages, and notices will be updated online each week. When Date: September […]