Fares
Regular Ride
$1.75/Ride
Senior 62+ / Medicare / Customer with Disability
$.75 peak
$.35 off-peak
K-12 and Community College Students
Free with GoPass
Low Income (LIFE)
20 Free rides/mo
Projects
Phase
Type
Location
Translate

NoHo to Pasadena Transit Corridor – Burbank Community Meeting #1

Virtual Meeting CA, United States

Metro has a plan to make it easier to get around, which includes improving bus service to better connect communities in the San Fernando and San Gabriel Valleys. Bus Rapid Transit (BRT) is faster and more reliable than regular bus service and can improve access to jobs, schools and recreation by providing connections to key […]

NoHo to Pasadena Transit Corridor – Burbank Community Meeting #2

Virtual Meeting CA, United States

Metro has a plan to make it easier to get around, which includes improving bus service to better connect communities in the San Fernando and San Gabriel Valleys. Bus Rapid Transit (BRT) is faster and more reliable than regular bus service and can improve access to jobs, schools and recreation by providing connections to key […]

South Sycamore Ave. Closure at Wilshire Blvd.

Summary  Beginning Saturday, September 25, 2021, and continuing through Monday, April 4, 2022, Wilshire Blvd. between Detroit St. and Highland Ave. will be reduced to two lanes in each direction. Sycamore Ave. immediately south of Wilshire Blvd. will be closed. This traffic control will support emergency exit construction adjacent to the Wilshire/La Brea Station.  When  September 25, 2021 through April 4, 2022.  Work hours are anticipated to be 7am to 8pm, five to six days per week.  Where  Wilshire Blvd. between Detroit […]

Instrumentation Work on Wilshire/Bonsall Ramp

Summary Metro contractors will conduct instrumentation work on the eastbound Wilshire Blvd. on- ramp at the VA Hospital Campus.  Date: Date: August 30 Work hours: 9am to 3pm Traffic Controls:  Eastbound lane reductions on Wilshire Blvd. between Federal Ave and Bonsall Ave.  Closure of the eastbound Wilshire Blvd. on-ramp for Bonsall Ave.  VA Hospital access will […]

Traffic Signal Light Pole and Foundation Removal on the north side of Wilshire Blvd. between Westwood Blvd. and Veteran Ave.

Summary  Metro contractors will remove traffic signals and foundations in Westwood from September 27 to October 8. Removal of the traffic signal light poles and foundations will be on the north side of Wilshire Blvd between Westwood Blvd and Veteran Ave.       When  Date: September 27 to October 8  Work hours: Monday to Friday, 9am to 3:30pm  Traffic Control:  Westbound Wilshire Blvd traffic control set for Stage […]

SCRRA Executive Committee

Virtual Meeting CA, United States

http://www.metrolinktrains.com/meeting

Daytime Utility Work at Gayley Ave. and Wilshire Blvd.

Summary  Metro contractors will continue utility work along Gayley Ave. and Wilshire Blvd. in preparation for the Purple (D Line) Extension Section 3 project.  The work consists of saw cutting, demolition, and trenching in preparation to pile installation work. Utility service and building access will be maintained.   Date: Saturday, October 9   Work hours:     6am to 5pm  Traffic Control:   Westbound lanes on Wilshire Blvd. will be reduced between Westwood Blvd. and Veteran […]

Scroll to Top