Fares
Regular Ride
$1.75/Ride
Senior 62+ / Medicare / Customer with Disability
$.75 peak
$.35 off-peak
K-12 and Community College Students
Free with GoPass
Low Income (LIFE)
20 Free rides/mo
Projects
Phase
Type
Location
Translate

Rail to River – Segment B: Community Update Meeting

Virtual Meeting CA, United States

Attend one of our community meetings on Zoom for an update and to provide input on the results of the process to select the project alternative. Both meetings will include the same information and Spanish interpretation will be provided.  Join one of the two meetings on the supplemental alternatives analysis study for Segment B, including: Project update Overview […]

Rail to River Community Update Meeting

Metro has a plan to make it easier to get around LA County, including streets that are safer for everyone. The project aims to extend the future active transportation corridor (Segment A) from the Metro A Line (Blue) Slauson Station to the Los Angeles River path. Visit the Project website (metroexemplifi.wpengine.com/r2r) additional background and information. […]

Traffic Signal Light Pole Installation at Wilshire Blvd and Westwood Blvd

Summary  Metro contractors will continue working on the traffic signal conduits, signal foundation, and installation of a traffic signal on weights and plates in Westwood from September 8 to 23. A new traffic signal light pole will be installed on the southwest corner of Wilshire Blvd and Westwood Blvd. When  Date: September 8 to 23 […]

Sidewalk Closure for UCLA Piling

Summary  Piling will continue on the north sidewalk of Wilshire Blvd between Gayley Ave and Veteran Ave. The piles support the walls underground for the future Westwood/UCLA Station.   When  Date: September 13 to October 8 Work hours: 7am to 9pm for drilling activities, 9pm to 11pm for maintenance  Traffic Control:  The north sidewalk of Wilshire Blvd will […]

Instrumentation Work on Wilshire/Bonsall Ramp

Summary Metro contractors will conduct instrumentation work on the eastbound Wilshire Blvd. on- ramp at the VA Hospital Campus.  Date: Date: August 30 Work hours: 9am to 3pm Traffic Controls:  Eastbound lane reductions on Wilshire Blvd. between Federal Ave and Bonsall Ave.  Closure of the eastbound Wilshire Blvd. on-ramp for Bonsall Ave.  VA Hospital access will […]

I-710 South Corridor Project: 710 Task Force – Meeting #1

1 Gateway Plaza, Los Angeles, CA, United States

The Metro Board recently suspended work on the environmental review for the I-710 South Corridor Project due to concerns over desired outcomes for air quality, equity, mobility and sustainability (Motion 47 and 48). The Board also directed staff to re-engage corridor stakeholders in a new process for examining how to make improvements within the 710 […]

Traffic Signal Light Pole Installation at Wilshire Blvd and Westwood Blvd

Summary  Metro contractors will continue working on the traffic signal conduits, signal foundation, and installation of a traffic signal on weights and plates in Westwood from September 8 to 23. A new traffic signal light pole will be installed on the southwest corner of Wilshire Blvd and Westwood Blvd. When  Date: September 8 to 23 […]

Instrumentation Work on Wilshire/Bonsall Ramp

Summary Metro contractors will conduct instrumentation work on the eastbound Wilshire Blvd. on- ramp at the VA Hospital Campus.  Date: Date: August 30 Work hours: 9am to 3pm Traffic Controls:  Eastbound lane reductions on Wilshire Blvd. between Federal Ave and Bonsall Ave.  Closure of the eastbound Wilshire Blvd. on-ramp for Bonsall Ave.  VA Hospital access will […]

Traffic Signal Light Pole Installation at Wilshire Blvd and Westwood Blvd

Summary  Metro contractors will continue working on the traffic signal conduits, signal foundation, and installation of a traffic signal on weights and plates in Westwood from September 8 to 23. A new traffic signal light pole will be installed on the southwest corner of Wilshire Blvd and Westwood Blvd. When  Date: September 8 to 23 […]

Instrumentation Work on Wilshire/Bonsall Ramp

Summary Metro contractors will conduct instrumentation work on the eastbound Wilshire Blvd. on- ramp at the VA Hospital Campus.  Date: Date: August 30 Work hours: 9am to 3pm Traffic Controls:  Eastbound lane reductions on Wilshire Blvd. between Federal Ave and Bonsall Ave.  Closure of the eastbound Wilshire Blvd. on-ramp for Bonsall Ave.  VA Hospital access will […]

Scroll to Top