Finance, Budget & Audit Committee
Virtual Meeting CA, United Statesboardagendas.metro.net
boardagendas.metro.net
Summary Beginning Saturday, September 25, 2021, and continuing through Monday, April 4, 2022, Wilshire Blvd. between Detroit St. and Highland Ave. will be reduced to two lanes in each direction. Sycamore Ave. immediately south of Wilshire Blvd. will be closed. This traffic control will support emergency exit construction adjacent to the Wilshire/La Brea Station. When September 25, 2021 through April 4, 2022. Work hours are anticipated to be 7am to 8pm, five to six days per week. Where Wilshire Blvd. between Detroit […]
boardagendas.metro.net
The Los Angeles County Metropolitan Transportation Authority Public Liability/Property Damage Claims Committee will hold a special meeting on Thursday, January 20, 2022, from 9-10am. Meetings are typically held on the second and fourth Monday of each month and this is a special meeting as it is an exception to the rule. Meeting agenda Listen and […]
Summary Metro contractors will conduct instrumentation work on the eastbound Wilshire Blvd. on- ramp at the VA Hospital Campus. Date: Date: August 30 Work hours: 9am to 3pm Traffic Controls: Eastbound lane reductions on Wilshire Blvd. between Federal Ave and Bonsall Ave. Closure of the eastbound Wilshire Blvd. on-ramp for Bonsall Ave. VA Hospital access will […]
Summary Metro contractors will remove traffic signals and foundations in Westwood from September 27 to October 8. Removal of the traffic signal light poles and foundations will be on the north side of Wilshire Blvd between Westwood Blvd and Veteran Ave. When Date: September 27 to October 8 Work hours: Monday to Friday, 9am to 3:30pm Traffic Control: Westbound Wilshire Blvd traffic control set for Stage […]
Agenda Packet. The Streets and Freeways Subcommittee is a technical subcommittee of Metro’s Technical Advisory Committee (TAC). The Streets and Freeways Subcommittee meets on the third Thursday of every month at 9:30 a.m.
boardagendas.metro.net
boardagendas.metro.net
Agenda Join the meeting: https://call.lifesizecloud.com/3694402 Passcode: 1234# Click to call from Mobile (audio only) United States: +1 (877) 422-8614, 3694402#,,1234# July 2021 Meeting Minutes September 2021 Meeting Minutes Electric Bus Update Presentation Traffic Reduction Study Presentation Meeting Recording January 2022
Pile Installation and support of excavation work will continue the north side of Wilshire Blvd between Westwood Blvd and Gayley Ave. The “piles” support the underground walls for the future Westwood/UCLA Station. The street will be restriped, and concrete “k-rail” barriers will be placed on Wilshire Blvd to protect the public outside of the work zones. Piling work will be completed in stages, and notices will be updated online each week. When Date: September […]
Summary Beginning Saturday, September 25, 2021, and continuing through Monday, April 4, 2022, Wilshire Blvd. between Detroit St. and Highland Ave. will be reduced to two lanes in each direction. Sycamore Ave. immediately south of Wilshire Blvd. will be closed. This traffic control will support emergency exit construction adjacent to the Wilshire/La Brea Station. When September 25, 2021 through April 4, 2022. Work hours are anticipated to be 7am to 8pm, five to six days per week. Where Wilshire Blvd. between Detroit […]