Metro’s plan for better transit includes converting the Crenshaw/LAX Transit Project’s at-grade crossing at Centinela and Florence Avenues in Inglewood to an above-grade crossing. This project will help to improve local traffic flow during events at The Forum and SoFi Stadium.
The project is currently in the 30% Preliminary Engineering (PE) design development phase. Pending funding availability, this project could potentially begin final design and construction in Fall 2022 and be completed by 2026.