Fares
Regular Ride
$1.75/Ride
Senior 62+ / Medicare / Customer with Disability
$.75 peak
$.35 off-peak
K-12 and Community College Students
Free with GoPass
Low Income (LIFE)
20 Free rides/mo
Projects
Phase
Type
Location
Translate

Rail to River Community Update Meeting

Metro has a plan to make it easier to get around LA County, including streets that are safer for everyone. The project aims to extend the future active transportation corridor (Segment A) from the Metro A Line (Blue) Slauson Station to the Los Angeles River path. Visit the Project website (metroexemplifi.wpengine.com/r2r) for additional background and […]

Instrumentation Work on Wilshire/Bonsall Ramp

Summary Metro contractors will conduct instrumentation work on the eastbound Wilshire Blvd. on- ramp at the VA Hospital Campus.  Date: Date: August 30 Work hours: 9am to 3pm Traffic Controls:  Eastbound lane reductions on Wilshire Blvd. between Federal Ave and Bonsall Ave.  Closure of the eastbound Wilshire Blvd. on-ramp for Bonsall Ave.  VA Hospital access will […]

Restoration of Street Stripping Concluding Sanitary Sewer Relocation

Summary Metro contractors will restripe the street for Sanitary Sewer relocation work that occurred on Ashton Ave, Midvale Ave, Westwood Blvd and Wilshire Blvd.  When: Date: September 10 to 11 Work hours: 9pm to 6am Traffic Control:   Stage 1 Westbound Wilshire Blvd middle lanes between Glendon Ave and Westwood Blvd will be reduced. There will be no left hand […]

Asphalt Restoration – Wilshire Blvd./Crescent Heights

Summary  On Saturday, September 11, from 7am to 8pm, Wilshire Blvd. between San Diego Way and La Jolla Ave. will be reduced to a single lane in each direction. Northbound McCarthy Vista will be reduced to one lane as well. This traffic control will support asphalt restoration on Wilshire Blvd.  When  Saturday, September 11, from […]

Rail to River – Segment B: Community Update Meeting

Virtual Meeting CA, United States

Attend one of our community meetings on Zoom for an update and to provide input on the results of the process to select the project alternative. Both meetings will include the same information and Spanish interpretation will be provided.  Join one of the two meetings on the supplemental alternatives analysis study for Segment B, including: Project update Overview […]

Rail to River Community Update Meeting

Metro has a plan to make it easier to get around LA County, including streets that are safer for everyone. The project aims to extend the future active transportation corridor (Segment A) from the Metro A Line (Blue) Slauson Station to the Los Angeles River path. Visit the Project website (metroexemplifi.wpengine.com/r2r) additional background and information. […]

Instrumentation Work on Wilshire/Bonsall Ramp

Summary Metro contractors will conduct instrumentation work on the eastbound Wilshire Blvd. on- ramp at the VA Hospital Campus.  Date: Date: August 30 Work hours: 9am to 3pm Traffic Controls:  Eastbound lane reductions on Wilshire Blvd. between Federal Ave and Bonsall Ave.  Closure of the eastbound Wilshire Blvd. on-ramp for Bonsall Ave.  VA Hospital access will […]

I-710 South Corridor Project: 710 Task Force – Meeting #1

1 Gateway Plaza, Los Angeles, CA, United States

The Metro Board recently suspended work on the environmental review for the I-710 South Corridor Project due to concerns over desired outcomes for air quality, equity, mobility and sustainability (Motion 47 and 48). The Board also directed staff to re-engage corridor stakeholders in a new process for examining how to make improvements within the 710 […]

Scroll to Top