SCRRA Board Meeting
Virtual Meeting CA, United StatesVirtual Meeting http://www.metrolinktrains.com/meeting
Virtual Meeting http://www.metrolinktrains.com/meeting
Summary Metro contractors will conduct instrumentation work on the eastbound Wilshire Blvd. on- ramp at the VA Hospital Campus. Date: Date: August 30 Work hours: 9am to 3pm Traffic Controls: Eastbound […]
Summary Metro contractors will remove traffic signals and foundations in Westwood from September 27 to October 8. Removal of the traffic signal light poles and foundations will be on the north side of Wilshire Blvd between Westwood […]
Join Metro’s On the Move Riders Program Friday, December 10 at 10:00 a.m. as we take a virtual field trip to the new Academy Museum of Motion Pictures in the […]
If you are 21 years old or older and interested in becoming a Metro bus operator, don’t miss our one-day hiring event on Saturday, December 11. There are more than […]
Pile Installation and support of excavation work will continue the north side of Wilshire Blvd between Westwood Blvd and Gayley Ave. The “piles” support the underground walls for the future Westwood/UCLA Station. The street will be restriped, and concrete “k-rail” barriers will be placed on […]
Summary Beginning Saturday, September 25, 2021, and continuing through Monday, April 4, 2022, Wilshire Blvd. between Detroit St. and Highland Ave. will be reduced to two lanes in each direction. Sycamore Ave. immediately south of Wilshire Blvd. will be closed. This traffic control will […]
Summary Metro contractors will conduct instrumentation work on the eastbound Wilshire Blvd. on- ramp at the VA Hospital Campus. Date: Date: August 30 Work hours: 9am to 3pm Traffic Controls: Eastbound […]
Summary Metro contractors will remove traffic signals and foundations in Westwood from September 27 to October 8. Removal of the traffic signal light poles and foundations will be on the north side of Wilshire Blvd between Westwood […]
As discussed in the first 710 Task Force meeting in September, Metro and Caltrans would like to develop a more collaborative public engagement process to guide our development of an […]
Pile Installation and support of excavation work will continue the north side of Wilshire Blvd between Westwood Blvd and Gayley Ave. The “piles” support the underground walls for the future Westwood/UCLA Station. The street will be restriped, and concrete “k-rail” barriers will be placed on […]
Summary Beginning Saturday, September 25, 2021, and continuing through Monday, April 4, 2022, Wilshire Blvd. between Detroit St. and Highland Ave. will be reduced to two lanes in each direction. Sycamore Ave. immediately south of Wilshire Blvd. will be closed. This traffic control will […]