SCRRA Executive Committee
Virtual Meeting CA, United Stateshttp://www.metrolinktrains.com/meeting
http://www.metrolinktrains.com/meeting
http://www.metrolinktrains.com/meeting
Summary Metro contractors will restripe the street for Sanitary Sewer relocation work that occurred on Ashton Ave, Midvale Ave, Westwood Blvd and Wilshire Blvd. When: Date: September 10 to 11 Work hours: 9pm to 6am Traffic Control: Stage 1 Westbound Wilshire Blvd middle lanes between Glendon Ave and Westwood Blvd will be reduced. There will be no left hand […]
Summary On Saturday, September 11, from 7am to 8pm, Wilshire Blvd. between San Diego Way and La Jolla Ave. will be reduced to a single lane in each direction. Northbound McCarthy Vista will be reduced to one lane as well. This traffic control will support asphalt restoration on Wilshire Blvd. When Saturday, September 11, from […]
Attend one of our community meetings on Zoom for an update and to provide input on the results of the process to select the project alternative. Both meetings will include the same information and Spanish interpretation will be provided. Join one of the two meetings on the supplemental alternatives analysis study for Segment B, including: Project update Overview […]
Metro has a plan to make it easier to get around LA County, including streets that are safer for everyone. The project aims to extend the future active transportation corridor (Segment A) from the Metro A Line (Blue) Slauson Station to the Los Angeles River path. Visit the Project website (metroexemplifi.wpengine.com/r2r) additional background and information. […]
Summary Metro contractors will continue working on the traffic signal conduits, signal foundation, and installation of a traffic signal on weights and plates in Westwood from September 8 to 23. A new traffic signal light pole will be installed on the southwest corner of Wilshire Blvd and Westwood Blvd. When Date: September 8 to 23 […]
Summary Piling will continue on the north sidewalk of Wilshire Blvd between Gayley Ave and Veteran Ave. The piles support the walls underground for the future Westwood/UCLA Station. When Date: September 13 to October 8 Work hours: 7am to 9pm for drilling activities, 9pm to 11pm for maintenance Traffic Control: The north sidewalk of Wilshire Blvd will […]
Summary Metro contractors will conduct instrumentation work on the eastbound Wilshire Blvd. on- ramp at the VA Hospital Campus. Date: Date: August 30 Work hours: 9am to 3pm Traffic Controls: Eastbound lane reductions on Wilshire Blvd. between Federal Ave and Bonsall Ave. Closure of the eastbound Wilshire Blvd. on-ramp for Bonsall Ave. VA Hospital access will […]
Due to the COVID-19 Safer at Home orders, all Regional Service Council Meetings have been moved online until further notice. Public participation is welcomed and encouraged. The San Gabriel Valley Service Council usually meets on the second Monday of each month at 5 pm. Meeting Agenda Agendas for previous meetings Watch Online: A link to […]
The Metro Board recently suspended work on the environmental review for the I-710 South Corridor Project due to concerns over desired outcomes for air quality, equity, mobility and sustainability (Motion 47 and 48). The Board also directed staff to re-engage corridor stakeholders in a new process for examining how to make improvements within the 710 […]
Summary Metro contractors will continue working on the traffic signal conduits, signal foundation, and installation of a traffic signal on weights and plates in Westwood from September 8 to 23. A new traffic signal light pole will be installed on the southwest corner of Wilshire Blvd and Westwood Blvd. When Date: September 8 to 23 […]